Isolite CG Application Stages

The photographs below show the application stages of Isolite CG that was conducted at Wakura Country Club, Ishikawa Pref., Japan.
  Stage One:

Water logged
area is
identified
       
Photographs are shots taken during and after application from various locations . Click thumbnails for bigger image.
 
               
     
  Stage Two:

Sod cutting
to remove
the top
surface of
the turf
        Stage Three:

Outline of
area to be
repaired
 
  Stage Four:

Soil from
affected area
is removed
  Stage Five:

Example of
presence of
water caused
by bad
drainage
 
  Stage Six:

CGL is
applied
extensively
        Stage Seven:

CG-1 (CGF) is then
introduced
on top of the
CGL
 
  Stage Eight:

Soil is re-
introduced
and mixed
evenly with
CG-1 (CGF)
  Stage Nine:

Final touch up
to the area
before the
surface of the
turf is
replaced