Isolite CG Application Stages |
||||||||||||||||||||||||
The
photographs below show the application stages of Isolite CG that was
conducted at Wakura Country Club, Ishikawa Pref., Japan. |
||||||||||||||||||||||||
| Stage
One: Water logged area is identified |
||||||||||||||||||||||||
Photographs are shots taken during and after application from various locations . Click thumbnails for bigger image. |
||||||||||||||||||||||||
| Stage Two: Sod cutting to remove the top surface of the turf |
Stage Three: Outline of area to be repaired |
|||||||||||||||||||||||
| Stage Four: Soil from affected area is removed |
Stage Five: Example of presence of water caused by bad drainage |
|||||||||||||||||||||||
| Stage Six: CGL is applied extensively |
Stage Seven: CG-1 (CGF) is then introduced on top of the CGL |
|||||||||||||||||||||||
| Stage Eight: Soil is re- introduced and mixed evenly with CG-1 (CGF) |
Stage Nine: Final touch up to the area before the surface of the turf is replaced |
|||||||||||||||||||||||